SELECT PROPERTY This modern and beautifully presented family home occupies an envious position, nestled towards the end of a desirable cul-de-sac within the popular Bluebell Grange development in Boulton Moor. Having been built with a wide variety of upgrades and additions, the property benefits from a home security alarm system, uPVC double glazing, gas central heating (brand new Vailant boiler 2024 with 10-year warranty), a valid Premier certificate, porcelain and Amtico flooring, integrated kitchen appliances, granite worksurfaces, off road parking together with a superb, large, one-and-a-half sized detached garage, landscaped, southerly-facing garden and offering spacious living accommodation throughout. Internal viewings are highly recommended to appreciate this superior property, which is situated in a most desirable location.\r
\r
In brief the property comprises: Entrance hallway with porcelain floor tiles and built-in storage cupboard; cloakroom/WC; spacious lounge with feature fire; separate dining room with wood-effect flooring; modern open-plan living/kitchen/dining room with twin French doors opening out onto the garden, and the kitchen area having a wide variety of storage options and an integrated dishwasher; separate utility room. To the first floor is a galleried landing leading to five bedrooms; master bedroom with en suite shower room having a double walk-in shower; family bathroom with modern four-piece suite.\r
\r
Outside, the front of the property features a storm porch together with well stocked flower and shrubbery beds. Sitting to the side is a driveway leading to the detached garage, which has power, lighting and work bench. The rear of the property features a stunning, southerly-facing, enclosed landscaped garden with lawn, patio seating areas, fruit trees, fence boundaries and having secure gated access leading to the front of the property. \r
\r
Barnard Drive is ideally situated for excellent road links to the A50, A6 and M1, shops and amenities within Chellaston and Alvaston and a newly-built school to be completed September 2024.